The proportional allocation of effort to various activities will change through time during asset recovery programs. The proportions of effort allocated to activities in Stage 2 with be dependent on identifying the asset recovery threshold and asset recovery ceiling specific to each program (see Box 1). A protracted requirement for the control of primary or secondary invasions indicates a stalled program that is unlikely to transition to Stage 2, demonstrating a need to reconsider the initial management goal. Note that values portrayed are for illustrative purposes only.

 
 
  Part of: Panetta FD, O’Loughlin LS, Gooden B (2019) Identifying thresholds and ceilings in plant community recovery for optimal management of widespread weeds. NeoBiota 42: 1-18. https://doi.org/10.3897/neobiota.42.30797